How to Inspect MoSi2 Heating Elements in Dental Sintering Furnaces
Regular inspection of MoSi2 heating elements is critical for maintaining consistent sintering quality and preventing unexpected furnace downtime. In dental laboratories where zirconia restorations demand precision, a failing heating element can mean the difference between perfect translucent crowns and costly white, opaque failures.

This comprehensive guide will show you exactly how to inspect your MoSi2 heating elements, how often to perform checks, and what warning signs to watch for.
Inspection Frequency: When to Check Your Elements
Recommended Inspection Schedule
Check the heating elements every 3 months to ensure they remain in good connecting condition. For dental laboratories, we recommend this inspection protocol:
Daily Quick Checks (Before Each Sintering Cycle):
- Visual inspection through furnace door or viewing port
- Monitor heating performance consistency
- Check for unusual sounds during heating
- Note any strange odors or smoke
Weekly Inspections:
- Verify electrical connections are secure
- Check for visible discoloration or deposits
- Monitor heating time trends
- Review temperature uniformity across chamber
Monthly Detailed Inspections:
- Comprehensive visual examination of all elements
- Electrical resistance measurements
- Temperature mapping across furnace chamber
- Connection tightness verification
- Documentation of element condition
Quarterly Comprehensive Service:
- Professional electrical system testing
- Detailed physical inspection with furnace cool and open
- Calibration verification
- Predictive replacement planning based on wear patterns
Usage-Based Triggers: After every 500-1000 sintering cycles or 2000-3000 operating hours, perform a thorough inspection regardless of time elapsed.
Step-by-Step Inspection Procedures
1. Daily Visual Inspection (Furnace Closed)
Equipment Needed:
- None (visual observation only)
Procedure:
- Before starting your first sintering cycle of the day, look through the furnace viewing port
- Check that all elements appear uniformly positioned
- Verify no visible debris or broken fragments in chamber
- Ensure elements maintain proper spacing (not touching each other or chamber walls)
What to Look For:
- ✓ All elements present and intact
- ✓ Uniform spacing maintained
- ✓ No visible contamination or deposits
- ✓ Clean chamber free of fallen material
Warning Signs:
- ⚠️ Broken element fragments on chamber floor
- ⚠️ Elements touching each other or chamber walls
- ⚠️ Visible bending or sagging of elements
- ⚠️ Heavy contamination or deposits
2. Weekly Connection Check (Furnace Cool)
⚠️ Safety First: Always disconnect power and allow complete cooling before opening furnace.
Equipment Needed:
- Screwdriver set
- Clean gloves
- Flashlight or work light
Procedure:
- Power Down: Disconnect all electrical power to furnace
- Cool Down: Wait minimum 6-8 hours after last use
- Open Furnace: Remove cover plate according to manufacturer instructions
- Inspect Connections: Examine each electrical connection point
Connection Inspection Checklist:
- ✓ Terminal screws tight (no visible looseness)
- ✓ Aluminum straps securely fastened
- ✓ No signs of arcing or burn marks
- ✓ Contact surfaces clean and bright (no heavy oxidation)
- ✓ Ceramic terminal blocks intact (no cracks)
The clip and the aluminum strap must be tightened to prevent the MoSi2 heating elements from being broken due to poor contact. Every 3 months, please fasten contact straps and stainless steel clips to prevent bad contact caused by constant thermal expansion and contraction.
Tightening Procedure:
- Gently tighten any loose terminal screws
- Check aluminum strap connections
- Verify ceramic clamps are secure
- Important: Don't over-tighten ceramic components (risk of cracking)
3. Monthly Physical Condition Assessment
Equipment Needed:
- Digital calipers
- Camera or smartphone
- Inspection checklist
- Measurement log book
Detailed Visual Examination:
A. Element Surface Condition
Inspect the MoSi2 element surface carefully:
Normal Appearance:
- Smooth, uniform gray surface on heated zone
- Transparent to slightly gray SiO2 protective layer
- Consistent coloration across element length
- No visible cracks or chips
Warning Signs Requiring Attention:
Yellow Powder or Film:
- Cause: Element operated too long at 400-700°C (pest oxidation zone)
- Impact: Contamination that can fall onto sintering zirconia and affect crown color
- Action: Adjust sintering program to pass quickly through this temperature range
Dark Discoloration:
- Cause: Normal aging from high-temperature oxidation
- Impact: Cosmetic only if uniform; indicates element approaching mid-life
- Action: Continue monitoring; plan replacement within 6-12 months
Orange Peel Texture:
- Cause: Grain growth from long-term high-temperature operation, making surface look rough like "orange peel" and causing overall thinning
- Impact: Indicates advanced aging; element weakening
- Action: Schedule replacement within 1-3 months
Visible Cracks:
- Cause: Thermal cycling stress, mechanical impact, or age-related brittleness
- Impact: Imminent failure risk; potential for element breakage
- Action: Replace immediately before next sintering cycle
B. Element Deformation Check
MoSi2 elements have soft plasticity at high temperatures and work with high current, causing the heated zone to expand outward under electromagnetic force. After extended use (typically around 2 years), the heated zone may develop noticeable bow-shaped deformation.
Measurement Procedure:
- Identify the center point of the heated zone (usually the bottom curve of U-shaped element)
- Use digital calipers to measure the distance between adjacent element hot zones
- Compare to original specifications (typically 25-35mm spacing)
- Document any changes from baseline measurements
Deformation Severity Assessment:
Minor Deformation (<5mm change):
- Continue monitoring monthly
- Plan replacement within 6 months
- Check temperature uniformity weekly
Moderate Deformation (5-10mm change):
- Impact: Beginning to affect temperature distribution
- May cause slight variations in sintering quality
- Schedule replacement within 1-2 months
Severe Deformation (>10mm change or elements touching):
- Impact: Significant temperature non-uniformity; white/opaque crowns likely
- Immediate replacement required
- Do not continue production use
C. Element Diameter Measurement
MoSi2 elements gradually thin over time due to oxidation:
Procedure:
- Measure element diameter at heated zone using digital calipers
- Compare to original specification (typical: 6mm, 9mm, or 12mm)
- Calculate percentage of material loss
Assessment:
- <10% reduction: Normal aging, continue monitoring
- 10-20% reduction: Advanced wear, plan replacement within 3-6 months
- >20% reduction: Critical thinning, replace within 1 month
4. Quarterly Electrical Testing
Equipment Needed:
- Digital multimeter (ohmmeter function)
- Insulation resistance tester (megohmmeter)
- Electrical testing records
A. Resistance Measurement
⚠️ Critical: Perform with furnace completely powered off and cooled.
Procedure:
- Disconnect power to furnace
- Set multimeter to resistance (Ω) mode
- Measure resistance across each element's terminals
- Record readings in maintenance log
- Compare to baseline values and manufacturer specifications
Resistance Analysis:
Normal Pattern:
- Resistance should remain relatively stable over element life
- Under normal operation, the resistance of MoSi2 elements generally does not change with the length of time
- Typical range: Varies by element size (check Walla BC specifications)
Warning Signs:
Resistance Increase >15%:
- Indicates material thinning or degradation
- Element approaching end of service life
- Plan replacement within 2-3 months
Sudden Resistance Drop:
- May indicate internal cracking or structural damage
- Potential short circuit development
- Investigate immediately; consider replacement
Infinite Resistance (Open Circuit):
- Element has failed internally
- Immediate replacement required
- Check for visible breaks
B. Insulation Testing
Procedure:
- Test resistance between element terminal and furnace ground
- Should read infinite resistance (>10 MΩ minimum)
- Any measurable continuity indicates insulation failure
Action if Failed:
- Identify source of ground fault
- Check for cracked ceramic insulators
- Verify element not touching chamber walls
- Replace damaged components before operation
5. Temperature Uniformity Verification
Equipment Needed:
- Multiple thermocouples or temperature sensors
- Data logging system (if available)
- Empty furnace (no restorations)
Procedure:
- Place thermocouples at different positions in furnace chamber
- Run empty sintering cycle to typical temperature (1550°C)
- Monitor temperature readings across all locations
- Document temperature variation
Acceptance Criteria:
- Temperature uniformity: ±5°C across working zone
- Any variation >±8°C indicates heating element issues
Troubleshooting Non-Uniformity:
- Check for deformed elements affecting heat distribution
- Verify all elements functioning (resistance test)
- Inspect for broken or cracked elements
- Consider element set replacement for optimal uniformity
Creating an Inspection Documentation System
Why Documentation Matters
Systematic record-keeping enables:
- Trend analysis to predict replacement timing
- Warranty claims with documented maintenance history
- Performance tracking to optimize element lifespan
- Quality assurance for dental laboratory accreditation
Essential Records to Maintain
Element Installation Records:
- Date of installation
- Element specifications (part number, dimensions)
- Baseline electrical resistance measurements
- Initial temperature uniformity data
- Installation photos
Routine Inspection Logs:
- Date and type of inspection performed
- Visual condition notes
- Electrical measurements
- Deformation measurements
- Temperature uniformity results
- Inspector name
- Any corrective actions taken
Performance Tracking:
- Operating hours counter readings
- Number of sintering cycles completed
- Heating time trends
- Energy consumption patterns
- Quality issues correlated with element condition
Sample Inspection Checklist
MoSi2 HEATING ELEMENT INSPECTION CHECKLISTFurnace Model: _______________ Serial #: _______________ Inspection Date: ______________ Inspector: ______________ Operating Hours: ______________ Cycles: _________________ VISUAL INSPECTION: ☐ Surface condition normal (no yellow deposits, cracks, or chips) ☐ Element spacing maintained (not touching) ☐ No visible deformation ☐ Protective layer intact and transparent ☐ Chamber clean, no debris ELECTRICAL CONNECTIONS: ☐ Terminal screws tight ☐ Aluminum straps secure ☐ No signs of arcing or burning ☐ Ceramic blocks intact MEASUREMENTS: Element Resistance: ____Ω (Baseline: ____Ω) Change: ____% Element Diameter: ____mm (Original: ____mm) Loss: ____% Element Spacing: ____mm (Original: ____mm) Deformation: ____mm TEMPERATURE UNIFORMITY: Position 1: ____°C Position 2: ____°C Position 3: ____°C Variation: ±____°C ☐ Within spec (±5°C) ☐ Exceeds spec ACTION REQUIRED: ☐ No action - continue normal operation ☐ Retighten connections ☐ Adjust sintering program (yellow deposits) ☐ Schedule replacement within __ months ☐ URGENT: Replace before next use NOTES: _____________________________________________________________ _____________________________________________________________ Next Inspection Due: ______________
Identifying Critical Warning Signs
Immediate Replacement Indicators
Stop production immediately and replace elements if you observe:
1. Visible Physical Damage:
- Cracks anywhere in element structure
- Broken pieces fallen to chamber floor
- Element terminals separated from heated zone
- Severe sagging with elements touching each other
2. Electrical Failures:
- Arcing or sparking visible during operation
- Ground fault/short circuit detected
- Element resistance change >20% from baseline
- Open circuit (infinite resistance) reading
3. Performance Degradation:
- Furnace unable to reach target temperature
- Heating time increased >30% from normal
- Temperature variation >±10°C across chamber
- Consistent quality issues with sintered restorations
4. Safety Hazards:
- Burning smell during operation
- Smoke visible from furnace
- Unusual sounds (popping, crackling)
- Excessive heat radiating from connections
Plan Replacement Soon (Within 1-3 Months)
Moderate warning signs indicating near end-of-life:
- Orange peel surface texture indicating grain growth
- Element diameter reduced >15% from original
- Moderate bow-shaped deformation (5-10mm)
- Yellow deposits requiring frequent cleaning cycles
- Resistance drift 10-15% from baseline
- Gradual increase in heating time (15-25%)
- Slight temperature non-uniformity (±6-8°C)
Monitor Closely (Increased Inspection Frequency)
Early warning signs requiring attention:
- Minor surface discoloration or darkening
- Element diameter reduced 10-15%
- Slight deformation <5mm
- Resistance change 5-10% from baseline
- Heating time increase 10-15%
- Occasional quality variations
Preventive Maintenance Best Practices
Connection Maintenance
Every 3 months, fasten contact straps and stainless steel clips to prevent bad contact caused by constant thermal expansion and contraction.
Quarterly Connection Service:
- Power down and cool furnace completely
- Remove cover plate for access
- Check each connection for tightness
- Clean contact surfaces with appropriate cleaner
- Apply slight tightening torque to screws
- Verify no loose connections remain
- Document maintenance performed
Chamber Cleaning
Regular chamber cleaning prevents contamination:
Monthly Cleaning Procedure:
- Allow complete cooling
- Remove all sintering trays and supports
- Vacuum or brush out loose debris
- Avoid contact with heating elements
- Clean carefully to avoid damaging the element, using appropriate tools and solutions
Cleaning Firing: Carry out a cleaning firing at regular intervals to prevent impurities from accumulating in the furnace chamber and causing color changes in restorations.
Operating Best Practices to Extend Element Life
Temperature Management:
- Don't use the furnace at 400-700°C temperature range for a long time because MoSi2 heating elements will be easily oxidized in this temperature range
- Pass through 400-700°C quickly (10-15°C/minute heating rate)
- Avoid unnecessary temperature cycling
- Avoid rapid heating and cooling to prevent the heating element from breaking. Maximum 10°C/min heating or cooling rate is suggested
Load Management:
- Don't exceed recommended chamber capacity
- Distribute restorations evenly for uniform heating
- Use appropriate sintering trays
- Never place restorations directly on elements
Program Optimization:
- Use manufacturer-recommended sintering profiles
- Minimize holding time at intermediate temperatures
- Implement gradual cooling protocols
- Avoid extreme temperature variations
When to Replace vs. Repair
Replace Individual Elements When:
- Single element shows visible damage or cracking
- One element has failed electrically
- Emergency situation requiring immediate production
- Element resistance differs significantly from others
Important Note: Resistance of a MoSi2 heating element does not change under normal use, and you can mix new and old elements together. However, for optimal temperature uniformity, complete set replacement is preferred.
Replace Complete Element Set When:
- Multiple elements showing similar aging patterns
- Elements approaching 3-5 years service life
- Comprehensive furnace refurbishment
- Quality consistency is critical
- Planned maintenance during slow production period
Advantages of Set Replacement:
- Guaranteed temperature uniformity
- Matched electrical characteristics
- Simplified future maintenance
- Extended warranty coverage
- Volume pricing advantages
Walla BC Product Advantage: Walla1800 MoSi2 Heating Elements
Superior Quality for Dental Applications
High-Purity Composition:
- Walla1800 grade MoSi2 elements
- Maximum operating temperature: 1800°C
- Optimal for dental sintering (1500-1600°C range)
- Extended service life through advanced metallurgy
Precision Manufacturing:
- Dimensional tolerances within ±0.1mm
- Electrical resistance matched within ±2%
- Consistent quality batch-to-batch
- Pre-delivery testing ensures reliability
Protective Packaging: Custom-engineered packaging protects fragile ceramic elements during shipping, ensuring your replacement elements arrive in perfect condition.
Easy Identification and Ordering
Each Walla BC element includes:
- Clear part number marking
- Dimensional specifications
- Electrical characteristics
- Installation date tracking
Compatible with Major Dental Furnace Brands:
- Zirkonzahn Zirkonofen Series
- Vita Zyrcomat
- Nabertherm LHT
- Ivoclar Programat
- MIHM Systems
- And many more
Troubleshooting Common Inspection Findings
Problem: Yellow Powder on Elements
Diagnosis: Pest oxidation from extended low-temperature operation
Solution:
- Review and adjust sintering program
- Increase heating rate through 400-700°C zone
- Run conditioning cycle at 1600°C for 2 hours
- If persistent, clean elements or replace
Prevention: Optimize heating profiles to minimize time in pest zone
Problem: Uneven Element Color
Diagnosis: MoSi2 heating elements should always be of the same color. If this is not the case, a cleaning firing may be necessary
Solution:
- Run empty cleaning cycle to 1600°C
- Hold for 2 hours to burn off contaminants
- Inspect after cooling
- If color remains uneven, consider replacement
Problem: Elements Touching or Deformed
Diagnosis: Electromagnetic force deformation from extended use
Solution:
- Immediate: Replace deformed elements
- Temporary: Reduce load and monitor closely
- Long-term: Schedule complete element set replacement
Impact: Temperature non-uniformity causing white/opaque zirconia crowns
Problem: Loose Connections
Diagnosis: Thermal expansion/contraction loosening over time
Solution:
- Tighten all connection screws properly
- Check aluminum straps and replace if damaged
- Inspect ceramic terminal blocks for cracks
- Apply appropriate torque (don't over-tighten ceramics)
Conclusion
Regular, systematic inspection of MoSi2 heating elements is essential for maintaining consistent sintering quality in dental laboratories. By following the inspection procedures outlined in this guide, you can:
- Predict and prevent element failures before they disrupt production
- Maintain optimal temperature uniformity for perfect zirconia restorations
- Extend element lifespan through proper preventive maintenance
- Reduce costs by avoiding emergency replacements and quality issues
- Ensure safety through early detection of electrical problems
Remember the key inspection schedule:
- Daily: Quick visual checks
- Weekly: Connection verification
- Monthly: Comprehensive physical inspection
- Quarterly: Full electrical testing and service
Need Replacement Elements?
Visit wallabconline.com/collections/mosi2-heating-elements to find precision-matched Walla1800 MoSi2 heating elements for your dental sintering furnace.
Technical Support Available: Our expert team can help you:
- Identify the right replacement elements
- Interpret inspection findings
- Optimize your maintenance schedule
- Troubleshoot performance issues
Contact Us: Email: info@wallabconline.com Website: wallabconline.com
Walla BC - Your Trusted Partner for High-Quality MoSi2 Heating Elements




Leave a comment
All blog comments are checked prior to publishing